Building wall or siding flashing details at horizontal surfaces.
Flashing for top of siding.
At the top tuck metal drip cap flashing under the siding and on top of the second layer of wrap.
To install the flashing cut pieces of building.
How to install flashing around a patio door when sealing a patio door check the manufacturer s instructions and be sure to follow the directions carefully.
Flashing materials choices installation details specifications.
Continue installing the z flashing at the top edge of the siding panels across the full length of wall.
If this is a repair job the siding must also be removed and replaced with the flashing.
Install the trim just under the drip cap.
Position the flashing lengths as defined in step 2 overlapping the ends a minimum of 2 inches onto the previous flashing piece and securing the flashing with 8d nails at each wall stud.
This aritcle describes the cause repair and prevention of leaks rot damage at a wood framed wall that was not properly flashed and sealed at the wall bottom.
Then slip flashing behind the siding covering the top edge of the ledger.
And like other flashing metal coil comes in most popular siding and soffit colors for easy matching and a professionally finished look.
Wall or siding connection to foundation top porch floors slabs.
Then cut away the siding.
Some types of roofing materials like concrete tile incorporate a.
Second step flashing needs to extend 8 to 14 inches above the shingles according to the national roofing contractors association nrca.
Start by making an outline on the siding where you want to position the ledger board.
Galvanized steel z flashing is made from 28 gauge galvanized steel.
If the kick out and step flashing can t tuck behind the siding screw on cap flashing to cover it then caulk along the top.
The seat dimension 3 8 in corresponds to the siding thickness.
On a wall to be covered with wood cement board vinyl or metal siding the step flashing and associated roofing must be installed first so the siding can cover the top of the step flashing on.
Make the outline large enough to include space for the deck boards on top the ledger and any trim boards on the sides.
Inspect the sidewall around and underneath the fascia and inside the house for signs of moisture damage and repair any rotted areas.
Installation of a continuous sheet of metal flashing from the top of the roof to the bottom of the roof in lieu of step flashing is not a correct method of installation in many instances.
First step flashing must be installed before the siding so that the siding can cover the top of the flashing.
Add felt if needed before nailing the new wood on and prime the new wood on all.
For more on extruded aluminum flashing options go to http.